KEN Property Sdn Bhd, the developers of Ken Damansara 3 Condominium has taken remedial measures to prevent further erosion at the collapsed retaining wall behind the high-rise blocks. Its managing director, Kenny Tan, said a meeting was held with councillors from Petaling Jaya City Council (MBPJ), consultants and a neighbouring developer to discuss the problem.
He said the affected area had been covered with plastic sheets to prevent further soil movement, including the cutting of trees as requested by MBPJ. He agreed with MBPJ councillor K.W. Mak’s statement that the responsibility for the damage should fall on the developer as the wall was designed and built by them.
Tan added that he was not aware the neighbouring developer had not handed the wall plans to the Department of Drainage and Irrigation (JPS). He also had no knowledge of the JPS refusing to take responsibility for the collapsed wall.
He added that none of Ken Holdings Berhad’s representatives were present during the meeting where the statement was made by a representative of Henry Butcher Property Managing Sdn Bhd.
He said the affected area had been covered with plastic sheets to prevent further soil movement, including the cutting of trees as requested by MBPJ. He agreed with MBPJ councillor K.W. Mak’s statement that the responsibility for the damage should fall on the developer as the wall was designed and built by them.
Tan added that he was not aware the neighbouring developer had not handed the wall plans to the Department of Drainage and Irrigation (JPS). He also had no knowledge of the JPS refusing to take responsibility for the collapsed wall.
He added that none of Ken Holdings Berhad’s representatives were present during the meeting where the statement was made by a representative of Henry Butcher Property Managing Sdn Bhd.
u website are very good
ReplyDeletekeep it updated.
i am loving to come here.
perhaps u can run some research on puncak damansara condo, kg kayu ara. i guess this condo was undervalue. location near with du, one utama, tv3, bu, and only around RM300psf now. wat u say?